Value capture · Nova Scotia / East Coast · A Transition · unconstrained
How much can Nova Scotia capture — and what has to be true?
Floor is what is committed or locked to the region today. Base adds cut-1 candidates at their win probability. Ceiling adds cuts 2–3 that meet the phase window, discounted. Every figure is a range that traces to a benchmark row. No single “the region will capture $X” number renders without its range and basis.
Floor · cumulative
C$7.7B–C$15.3B
committed / locked to region · undiscounted CAD
Base · cumulative
C$9.7B–C$19.3B
floor + cut 1 at win-probability A 0.5 · B 0.25 · C 0.1
Ceiling · cumulative
C$10.0B–C$20.0B
base + cuts 2–3 meeting the window, ×0.5
Addressable envelope
C$28.7B–C$57.4B
Σ package envelopes across phases · no correlation modelling (E8)
Per phase and cumulative
Floor · base · ceiling
MLU dependency. C$1.6B of the MLU-era range sits above the floor and depends on the S5 engineering base built during Transition. Build S5 engineering depth in the 2030s or lose the 2050s.
Every number traces to a row
Benchmark register
Ranked by value at stake, then deadline
What has to be true · 54 conditions
1provinceControlled work areas can be financed and built
2 packages · open
C$5.0Bby 20342firmA sub-safe / class path exists in NS
1 package · open
C$3.8Bby 20343provinceCertified welders / fitters pipeline exists
1 package · open
C$3.8Bby 20344federalAnchor docking contract
1 package · open
C$3.8Bby 20345provinceEast-coast site
1 package · open
C$3.8Bby 20346primeSub-safe qualification
1 package · open
C$3.8Bby 20347primeJV with NS yard
1 package · open
C$3.8Bby 20348federalAnchor contract
1 package · open
C$3.8Bby 20349firmA CGP path exists in NS
2 packages · open
C$1.8Bby 203410firmA CWB + class welding path exists in NS
1 package · open
C$1.3Bby 203411provinceCertified welders pipeline exists
1 package · open
C$1.3Bby 203412firmA sub-safe / class welding path exists in NS
1 package · open
C$1.3Bby 2034Generated from the pathway dimensions and pull requirements behind every base→ceiling contributor, deduplicated. Owner type is inferred: certification and plant → firm; skills and site → province; anchor contract and ITB credit → federal.