Skip to content
Workspace / Sample analysisResearch. Understand. Act.
← Back to industry reportSample analysis · CPSP
Sample scenario controls
Scenario
Sovereignty
Phase
Stress test
S4 · stage 4 of 9 · build · relational governance · In-Service Support

Deep maintenance & MRO

Docking work periods for the six east-coast boats. FMF Cape Scott today; TKMS–Seaspan sustainment enterprise announced.

Firm (partial)Single source · facility

Dry-docking & hull survey Firm (partial)

Docking work periods: hull survey, pressure-hull inspection, tank work, structural repair.

Buyer tier1Recurrence per dockingCertifications sub-safe / class, CGP, Secret facilityPhases transition · steady state · mluFaC Act nowSingle source · facility
Envelope · transition
C$294MC$588M
base C$420M · 90% addressable from NS
Victoria-class ISS run-rate · row 2
Capacity vs demand · A
Available 1 · demand 1 docking lines · committed, not yet producing 1
Redundancy (separate from capacity)
1 producing source vs target 2no backup
“Can it make enough” and “is there a backup” are different questions (C9).
Sourcing mix
CA 100%shares est.
Supply network · tier = path distance (computed)
T1
Fleet maintenance & docking (Victoria class today) — current fleet; 212CD scope unformed · 1 docking lines
Producing
T1
Integrated sustainment enterprise docking line (announced) · 1 docking lines · from 2036
Committed, not yet producing
T2Open position — no second source; redundancy target not met
5 candidates on the ladder below
Opportunity ladder · 5 candidates · pursuit tier computed, relationship never enters
Cut 1Already in the frame
functional
NS · Halifax · enterprise · fit rank #1
Second docking line at Halifax Shipyard
medium difficulty · 12–24 months · Sub-safe programme; capacity conflict with River-class build (W7)
A
process
NS · Dartmouth · sme · fit rank #2
Underwater hull survey & inspection services
low difficulty · < 12 months · Security clearance; class-inspector partnership
A
Cut 2Could get there — with the lift
functional
NS · Dartmouth · sme · fit rank #3
Docking trades package (sub-safe)
high difficulty
Certification
24 mo
Capital
12 mo
Plant
12 mo
Skills
30 mo
Ready2030 · meets 2031 window
B
Cut 3Must be attracted — with the pull
chain entry
QC · Lévis · large · fit rank #4
Second docking operator outside Halifax (redundancy)
high difficulty
  • Pull: anchor docking contract
  • Pull: east-coast site
  • Pull: sub-safe qualification
B
chain entry
ON · Hamilton · mid · fit rank #5
Docking services entrant via NS yard partnership
high difficulty
  • Pull: JV with NS yard
  • Pull: anchor contract
B

Battery replacement & handling Firm (partial)

Lithium-ion main battery replacement, handling, storage and disposal.

Buyer tier1Recurrence per dockingCertifications UN 38.3, CGPPhases transition · steady state · mluFaC Act nowSingle source · facility
Envelope · transition
C$74MC$147M
base C$105M · 60% addressable from NS
Victoria-class ISS run-rate · row 2
Capacity vs demand · A
Available 1 · demand 1 docking lines · committed, not yet producing 1
Redundancy (separate from capacity)
1 producing source vs target 2no backup
“Can it make enough” and “is there a backup” are different questions (C9).
Sourcing mix
CA 100%shares est.
Supply network · tier = path distance (computed)
T1
Battery handling (lead-acid today) — lead-acid today; Li-ion handling unformed · 1 docking lines
Producing
T1
Li-ion battery replacement (enterprise scope) · 1 docking lines · from 2036
Committed, not yet producing
T2Open position — no second source; redundancy target not met
1 candidate on the ladder below
Opportunity ladder · 1 candidates · pursuit tier computed, relationship never enters
Cut 2Could get there — with the lift
product
NS · Dartmouth · micro · fit rank #1 · placeholder record
Li-ion module handling & test in Halifax
high difficulty
Certification
24 mo
Capital
12 mo
Plant
24 mo
Skills
18 mo
Ready2029 · meets 2031 window
B

Structural steel fabrication & repair Firm (partial)

Hull inserts, tank plating, brackets and foundations fabricated to class and sub-safe standards.

Buyer tier1Recurrence per dockingCertifications sub-safe / class welding, CGPPhases transition · steady state · mluFaC Act nowSingle source · facility
Envelope · transition
C$98MC$196M
base C$140M · 85% addressable from NS
Victoria-class ISS run-rate · row 2
Capacity vs demand · A
Available 1 · demand 1 docking lines · committed, not yet producing 1
Redundancy (separate from capacity)
1 producing source vs target 2no backup
“Can it make enough” and “is there a backup” are different questions (C9).
Sourcing mix
CA 100%shares est.
Supply network · tier = path distance (computed)
T1
Structural repair, sub-safe welding — current fleet scope · 1 docking lines
Producing
T1
Structural fabrication (enterprise scope) · 1 docking lines · from 2036
Committed, not yet producing
T2Open position — no second source; redundancy target not met
2 candidates on the ladder below
Opportunity ladder · 2 candidates · pursuit tier computed, relationship never enters
Cut 2Could get there — with the lift
product
NS · Dartmouth · sme · fit rank #1
Non-pressure structural fabrication to class
medium difficulty
Certification
12 mo
Capital
6 mo
Plant
0 mo
Skills
18 mo
Ready2029 · meets 2031 window
A
product
NS · Dartmouth · mid · fit rank #2
Sub-safe structural inserts and foundations
high difficulty
Certification
24 mo
Capital
12 mo
Plant
12 mo
Skills
30 mo
Ready2030 · meets 2031 window
B

Coatings & preservation Firm today

Hull coatings, tank preservation, anechoic tile repair.

Buyer tier1Recurrence per dockingCertifications CGPPhases transition · steady state · mluFaC WatchSingle source · facility
Envelope · transition
C$49MC$98M
base C$70M · 90% addressable from NS
Victoria-class ISS run-rate · row 2
Capacity vs demand · A
Available 1 · demand 1 docking lines · committed, not yet producing 1
Redundancy (separate from capacity)
1 producing source vs target 2no backup
“Can it make enough” and “is there a backup” are different questions (C9).
Sourcing mix
CA 100%shares est.
Supply network · tier = path distance (computed)
T1
Hull coatings & preservation · 1 docking lines
Producing
T1
Coatings (enterprise scope) · 1 docking lines · from 2036
Committed, not yet producing
T2Open position — no second source; redundancy target not met
1 candidate on the ladder below
Opportunity ladder · 1 candidates · pursuit tier computed, relationship never enters
Cut 2Could get there — with the lift
process
NS · Dartmouth · micro · fit rank #1 · placeholder record
Tank preservation & anechoic tile repair
medium difficulty
Certification
12 mo
Capital
6 mo
Plant
0 mo
Skills
12 mo
Ready2028 · meets 2031 window
A

Valve, pump & hydraulic overhaul Firm today

Hull valves, seawater pumps, hydraulic plant overhaul and test.

Buyer tier1Recurrence per dockingCertifications sub-safe / class, CGPPhases transition · steady state · mluFaC Act nowSingle source · facility
Envelope · transition
C$74MC$147M
base C$105M · 80% addressable from NS
Victoria-class ISS run-rate · row 2
Capacity vs demand · A
Available 1 · demand 1 docking lines · committed, not yet producing 1
Redundancy (separate from capacity)
1 producing source vs target 2no backup
“Can it make enough” and “is there a backup” are different questions (C9).
Sourcing mix
CA 100%shares est.
Supply network · tier = path distance (computed)
T1
Valve, pump & hydraulic overhaul · 1 docking lines
Producing
T1
Overhaul (enterprise scope) · 1 docking lines · from 2036
Committed, not yet producing
T2Open position — no second source; redundancy target not met
2 candidates on the ladder below
Opportunity ladder · 2 candidates · pursuit tier computed, relationship never enters
Cut 1Already in the frame
product
NS · Chester · sme · fit rank #1
Hydraulic plant overhaul & test
medium difficulty · 12–24 months · Sub-safe QA; CGP
A
Cut 2Could get there — with the lift
process
NS · Halifax · micro · fit rank #2 · placeholder record
Hull-valve overhaul under enterprise QA
medium difficulty
Certification
18 mo
Capital
6 mo
Plant
6 mo
Skills
18 mo
Ready2029 · meets 2031 window
B

Curated sample analysis · as of 2026-09-10. Source attributions and benchmark estimates require review.